Fluor to Design, Build, Operate, and Maintain 170MW Centinela Solar Energy Facility in California

By EC&M:

Fluor Corp. recently announced that Centinela Solar Energy, LLC, a member of LS Power Group, has awarded the company a lump-sum engineering, procurement and construction (EPC) contract, as well as a separate contract for ongoing operations and maintenance services for its new nominal 170MWt solar photovoltaic (PV) facility located in Southern California. Fluor has been awarded both the 125MW Phase I and the 45MW Phase II of the Centinela project and received full notice-to-proceed for Phase I, which was booked into backlog in the third quarter of 2012. Phase II is expected to be released in the first quarter of 2013.

“This significant new win for Fluor further solidifies our position as a leader in the solar power engineering and construction industry,” said Dave Dunning, president of Fluor’s Power Group… Read more

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: